Saskatoon, SK

Brighton Village Centre Townhomes and Apartments

Project Details

Value:

Confidential

Completion:

2023/2024

Size:

Varied

Services:

Architecture

Nestled in the heart of Saskatoon’s rapidly expanding Brighton neighborhood on the east end, the Brighton Village Centre sprawls across 14 acres, offering a dynamic fusion of townhomes, apartments, offices, and retail spaces. Since 2020, aodbt has been in close partnership with Dream to manifest their innovative rental vision within Saskatoon’s ever-evolving rental landscape.

The first phase, completed in the summer of 2022, included two townhome buildings: one with six units and another with nine. These townhomes feature ground-floor garages and entries, as well as versatile main floor bonus rooms that can serve as guest bedrooms or home offices. The garages provide a highly valued luxury, especially during the harsh winter months. The second floor houses the living spaces, comprising a spacious kitchen with an eat-up island, a dining area, a living room, and a half-bathroom.
Bedrooms and laundry facilities thoughtfully occupy the third floor. The townhomes encompass a mix of three-bedroom and two-bedroom units, some with single-car garages, and others with double-car garages.

The initial townhomes enjoyed tremendous success, with all units leased before construction completion. aodbt is currently collaborating with Dream to deliver an additional 100+ townhome units for the Brighton Village Centre and its surroundings.

The Brighton Village Centre Apartments, a four-storey mixed-use building, feature approximately 885 square meters of commercial retail space and 120 residential units. The L-shaped design prominently occupies a corner of the Brighton Village Centre, with street-facing retail units on the ground floor and a unique retail space tailored for a coffee shop or similar anchor tenant on the building’s primary outer corner. The remaining first floor and upper stories house the 120 residential units, featuring a mix of two-bedroom, one-bedroom, and studio units, with a primary focus on one-bedroom options. Each unit is equipped with a kitchen island, a living room, a laundry room, and an outdoor deck. The building also includes underground parking, a dog wash area, and a fitness centre on the main floor

Construction of the Brighton Village Apartments is currently underway, with completion slated for summer 2024. aodbt is also collaborating with Dream on a second apartment building that will feature 125 units on an adjacent site, with construction set to commence in late summer 2023.